Repairing machines requires a lot of space. The components of every machine that is dismantled and inspected have to be stored temporarily until the customer decides whether or not to repair the machine. This takes up a lot of space, which is why we often reach the limits of our capacity when we are working at full capacity. Every pallet that stands in the production area "disrupts" the efficient workflow of our production. To remedy this, we have built a high-bay warehouse in which the components are stored safely and protected against environmental influences. With around 400 pallet spaces and an IT-based storage system, we are now able to make better and more efficient use of the available space in the workshop. The warehouse is scheduled to go into operation in July 2025.
Search
Latest posts
Keywords
Ausbildung
Ausbildung2025
authoriserte Werkstatt
BHKW
Blcokheizkraftwerk
conditionmonitoring
coole jobs
coole Jobs in Hamburg
Dieselmotoren
effiziente Produktion
Elektromaschinenbau
Elektromotor
elektroniker
elektroniker für maschinen und antriebstechnik
Energiewende
Generatoren
hamburg
IIOT
industriekaufmann
Instandhaltung
KI
Kompetenz
KUNUNU
künstliche Intelligenz
Lagerfläche
maintenance
Mechatroniker
Schlosser
Service
Servicepartner
spiot sensor
TECO
TOP ARBEITGEBER
traumjob
WEG
zerspaner
Zukunft